Surgery floor addition
GRAND JUNCTION, Colo. — A mannequin lays inside one of the new operating rooms at the Grand Junction Department of Veterans Affairs Medical Center here, Mar.23, 2012. The U.S. Army Corps of Engineers Sacramento District oversaw construction of the $13 million surgery floor addition, which adds two specialty operating rooms and two general operating rooms.

Download Image: Full Size (8.35 MB)
Tags: usace
Photo by: Carlos Lazo (photo illustration) |  VIRIN: 120323-A-CE999-001.JPG